1. Supply Water Tube Steam Boiler 1 x 50 ton/hr – Membrane type

Company/Year           : PT Indonesian Marine (2010)

End User                     : PT Gunung Sejahtera Dua Indah (Astra Agro Lestari Group)

Location                       : Sei Bengkoang – Kalimantan Tengah

Scope of Work            :

1. Design Engineering
2. Fabrication
3. Site Installation
4. Commissioning

Job Description :

1. Perform Engineering Project Coordinator
2. Perform Mechanical Design & Calculation

 Foto-foto :

SAM_7788.JPG

sam_7691

sam_7695

 

sam_7696

sam_7838

2. Supply Water Tube Steam Boiler 1 x 35 ton/hr – Membrane type

Company/Year           : PT Indonesian Marine (2012)

End User                     : PT Perkebunan Lembah Bhakti (Astra Agro Lestari Group)

Location                       : Aceh Singkil

Scope of Work            :

1. Design Engineering
2. Fabrication
3. Site Installation
4. Commissioning

Job Description :

1. Perform Engineering Project Coordinator
2. Perform Mechanical Design & Calculation

 Foto-foto :

sam_7553

sam_7561

 

sam_7608

sam_7564

sam_7610

3. Supply Water Tube Steam Boiler 1 x 35 ton/hr – Membrane type

Company/Year           : PT Indonesian Marine (2009)

End User                     : PT Graha Cakra Mulia

Location                      : Lamandau – Kalimantan Tengah

Scope of Work            :

1. Design Engineering
2. Fabrication
3. Site Installation
4. Commissioning

Job Description :

1. Perform Engineering Project Coordinator
2. Perform Mechanical Design & Calculation

 Foto-foto :

4. Supply Water Tube Steam Boiler 2 x 25 ton/hr – Membrane type

Company/Year           : PT Indonesian Marine (2011)

End User                     : PT Sumber Kharisma Persada

Location                       : Samarinda – Kalimantan Timur

Scope of Work            :

1. Design Engineering
2. Fabrication
3. Site Installation
4. Commissioning

Job Description :

1. Perform Engineering Project Coordinator
2. Perform Mechanical Design & Calculation

 Foto-foto :

5. Supply Water Tube Steam Boiler 2 x 35 ton/hr – Membrane type

Company/Year           : PT Indonesian Marine (2010)

End User                     : PT Surya Raya Lestari (SRL)

Location                      : Mamuju – Sulawesi Barat

Scope of Work           :

1. Design Engineering
2. Fabrication
3. Site Installation
4. Commissioning

Job Description :

1. Perform Engineering Project Coordinator
2. Perform Mechanical Design & Calculation

 Foto-foto :

6. Engineering-Procurement-Construction of Chiller Package & Condensate Stabilization Unit 42 MMSCFD

Company/Year          : PT Pacific Process Engineering (2012)

End User                    : PT Pertamina EP

Location                     : Pondok Makmur, Bekasi – Jawa Barat

Scope of Work          :

1. Design Engineering
2. Fabrication
3. Site Installation
4. Commissioning

Job Description :

1. Perform for Engineering Project/Coordinator
2. Perform for Pressure Vessel Analysis
3. Perform for Structure Analysis
4. Perform for Mechanical Design Analysis
5. Perform for Site Work Coordinator

Foto-foto :

20160727_124847

20160727_125314

20160727_125028

20160727_125457

20160727_125521

20160727_125613

 

 

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s